Connection: | Female |
---|---|
Structure: | Universal |
Flexible or Rigid: | Rigid |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item |
Description |
Material |
Carbon steel |
Deliver Time |
Sample order:3-4 days |
Usual order: 15-20 days since received disposit |
|
Payment |
T/T LC |
Origin |
China (Mainland) |
Surface Treatment |
Hot dip ganvanized |
Trade Size |
1/2", 3/4", 1", 1-1/4", 1-1/2", 2" |
Technics |
Forged. Casting |
Finish |
Zinc Electro-Plated |
Application |
Used to join two lengths of EMT. Concrete tight when taped. |
Port |
Xiamen |